Beykoz Kundura Buildings number 8-9-10 (Beykoz/ İstanbul, 2017)
Beykoy Kundura that made its name with hosting movies and series shootings, has a very deep-rooted and all-around history. This foundation that played a significant role in industrialization history, is an example of one of the rare industrial cultural heritage which is in business continuously from the Ottoman era to the Republic era in İstanbul. All the old buildings within Beykoz Kundura are officially registered as a second-degree historical building. Within this framework, electric works of buildings number 8-9-10 were carried out. Special installing and implementation works of theatre, cinema, common foyer-backstage areas integrated in the buildings were carried out.
Beykoz Kundura Medium Voltage, Low Voltage Energy Supply Infrastructure and Superstructure Works (Beykoz/ İstanbul, 2018 - continue)
Beykoz Kundura that was established in about 200.000 m² area, needed a new energy infrastructure which can supply the need of the modern-day. For this purpose, 34.5 kV power transformer 4x1000 kVA in total, four transformer configuration input/output Medium voltage cell post, low voltage patch panels, 8 pieces 550 kVA generator plant, the supply of low voltage energy cable to its reinforcements spread over 200.000 m² area, installment of terminal box, installment of marshaling kiosks, film plato patch panels, installment of marine type panels, environmental lighting works, with our rope access partner, outdoor lighting installation of high rise buildings design and perform were carried out.
Cooperation with Beykoz Kundura continues within the scope of medium voltage, low voltage energy supply, infrastructure and superstructure works.